Waverley Package 4

The project to improve Edinburgh’s historic Waverley Station had an extensive scope and was therefore split into four packages. Package 4 involved the repair and rationalisation of services in the main building and operation building, coupled with resurfacing the main building’s internal concourse. Spencer Group also completed the Package 3 works at the station.

Key Project Details

Client Network Rail
Duration 14 months
Location Edinburgh
Contract Form JCT05

Project Scope

The works to the station mainly comprised the station building roof repair works (including glazing above the ticket hall). This involved the removal of redundant elements on the roof and the renewal and repair of roof drainage systems. Spencer Group also carried out a series of other major works, including:

• the provision of an external lift and link bridge to the operations centre building
• the installation of a new passenger lift in the main station building
• the reconfiguration of the Calton Road car park entrance
• the strengthening of the existing Calton Road bridge
• the renewal of services infrastructure, including distribution switchboards
• the cleaning and repair of stonework, woodwork and decorative metalwork in the ticket hall of the main station

The project involved

2 lifts installed
Grade A listed building restoration

Outcome

The completion of Package 4 has made Edinburgh Waverley a safer, more reliable station for both passengers and staff. The station remained fully operational whilst all works were carried out.

The works have also made the passenger experience considerably more efficient, allowing for greater numbers to pass through smoothly. The provision of the new lifts has allowed for upgraded access, especially for those with limited mobility, and the reconfiguration of the Calton Road car park has improved traffic flow.

The restoration and replacement work Spencer Group carried out has contributed to protecting the heritage of this impressive Victorian station – the UK’s largest station outside London.


Find out more about our Rail services

The project involved

6 new power supplies designed